
A driveway designed around daily use
Stable preparation
We compact calibrated aggregate in layers rather than relying on loose fill.
Planned water control
We assess falls and suitable drainage before laying the final surface.
Clear material choices
We compare finishes by loading, upkeep, appearance and permeability.
A driveway starts well below the surface
Tyre ruts, rocking blocks and puddles usually point to what is happening underneath, not just to a tired top layer. For a new driveway in Newbury, we excavate to a stable subgrade and plan the build around the site's levels and vehicle use. A typical specification may include geotextile separation, calibrated MOT Type 1 aggregate, mechanical compaction, firm edge restraints and purpose-designed drainage. During the survey, we assess access, boundaries, utilities, subsoil stability and fall gradients. We then prepare a written scope so you can see how the base, drainage and visible surface fit together. The unexciting layers do most of the hard work.


Choose the finish by use, not guesswork
Block paving gives defined patterns and repairable sections, while resin can provide a smooth permeable finish over the right open-graded base. Tarmacadam suits practical vehicle areas, tar and chip works well across broad rural-style access, and gravel or shingle offers a looser appearance with different upkeep needs. We can incorporate permeable paving, soakaways, French drains or channel drainage where suitable. A standard two-car block-paved drive usually takes 4 to 7 working days, with size, excavation depth and drainage affecting the schedule. We explain those variables before construction begins.
Frequently asked questions
Which driveway surface is right for our property?
We compare your preferred appearance with vehicle loading, maintenance, drainage and budget. Block paving, resin, tarmacadam, tar and chip, gravel and shingle each behave differently, so the site survey guides the recommendation.
How will you deal with rainwater from the drive?
We assess existing falls, runoff routes and available ground during the survey. Suitable options may include a permeable surface, soakaway, French drain or channel drainage, designed around the property and relevant SuDS needs.
How long will a new driveway take to install?
A standard two-car block-paved driveway commonly takes 4 to 7 working days. Larger dimensions, unstable subsoil, deeper excavation or additional drainage can extend the programme, which we set out in the written scope.


